Client
SEEK
Architect
HASSELL
Services Engineer
ARUP
Quality Supervisor
Altus Page Kirkland
Completion
July 2021
Program
19 weeks
Contract Sum
Undisclosed

Extensive preparation and collaboration enabled Buildcorp to deliver 20,000m² of purpose-built office space for SEEK, Australia’s leading job website, in less than 19 weeks during a global pandemic. 

The project over seven-levels at SEEK’s headquarters in Cremorne, is Buildcorp’s largest fit-out in Victoria.

Our team was appointed in mid-2020 alongside Hassell, CBRE, ARUP, Altus Group and landlord Cremorne Properties.

A fast-track project of this scale required six months of pre-construction planning to de-risk the project and fine tune the design alongside base building and interior architect Hassell and ARUP. Careful coordination, testing and protection of the Under Floor Air Distribution system throughout the building was painstakingly planned to enable the team to hit the ground running. Identifying long lead time items, ordering material in advance and planning for the early handover of the main and field comms rooms for SEEK’s IT team was key for the project’s success.

Other innovative methods to ensure SEEK’s timeframes were met included the use of a material hoist positioned inside the stair void to expedite material movement, while a significant number of Buildcorp’s team members and labour resources consistently maintained works across all floors concurrently.

The project fit-out includes:

  • Ground floor, including entrance lobby and expansive events space
  • 81 meeting rooms
  • 5 seminar rooms
  • Boardroom
  • Collaboration spaces
  • Levels 1-5 are work zones an include over 500 workstations
  • Level 6 is the entertaining area and includes beer taps
  • Substantial audio visual package
  • Acoustics rated at 35Rw to 45Rw
  • 2 Commercial Kitchens
  • Integrated coffee machines
  • Wintergardens on multiple floors
  • Over 1500 workstations
  • An Under Floor Air Distribution (UFAD) system throughout the building

Key elements of the project include:
Locally sourced materials showcasing Australian designers. In particular, the ground floor reception required an exceptionally high-quality finish and attention to detail. For these elements, our in-house joinery business Euroline was selected.

Switch glass was used for the ground floor central meeting rooms to create privacy without inhibiting the view through the space.

The fully operable Market Place auditorium space is designed to be configured to offer multiple meeting spaces with glazed frontages to allow as much natural light to flow from the ground floor garden as possible.

The Hub space on level 6 is dedicated to SEEKers and provides a place to mingle, relax and have fun. The top floor space includes a bar, games area, a freestanding commercial kitchen pod designed and installed by Mariljohn, a variety of eating spaces and a rooftop terrace with breathtaking views over Melbourne’s skyline.

Buildcorp_Workplace_Major_SEEK_2
Buildcorp_Workplace_Major_SEEK_3
Buildcorp_Workplace_Major_SEEK_4
Buildcorp_Workplace_Major_SEEK_5
Buildcorp_Workplace_Major_SEEK_

In building SEEK’s landmark global headquarters in Cremorne during the pandemic, Buildcorp’s structured approach to communication ensured we were able to proactively manage any risks and engage with our internal stakeholders throughout the process.

Brigid Carey | SEEK
SEEK Video cover-minSEEK Video cover-min

Services & Sectors

The key services delivered and sector expertise developed on this project.

Fit-out

View Projects

Joinery

View Projects

Major Workplace

View Projects
We’re with you.

Considering partnering with us?

Send us a message below and one of our team members will be in touch.

buildcorp-project-4