Transurban Queensland Traffic Control Room
300 George St
Brisbane QLD 4000
300 George St
Brisbane QLD 4000
Transurban Queensland Airport Link Operations Centre (ALOC) Traffic Control Room (TCR) strategy was realigned with the view to consolidating the TCR function within a single “world class” facility.
Phase 1 of the strategy included a 2 floor fitout within the existing Kedron facility requiring the existing TCR remain operational while the new works constructed adjacent. The new space inclusive of a second TCR, structural modifications to improve the open plan workspace layout, comms / data room expansion and infrastructure in preparation for phase 1 and refurbished deck was carefully planned and communicated ensuring no interruptions to the 24 hour operations of this facility.
Key features and challenges of the project included:
The key services delivered and sector expertise developed on this project.