Email Phone Next Scroll to move Touch to move edit Play Play Pause Volume Mute Zoom Open Close Search Linked In X Facebook Instagram Close

Transurban Queensland Traffic Control Room

300 George St
Brisbane QLD 4000

Landscape_Transurban TCR_1920x951_2-min
Landscape_Transurban TCR_1920x951_3-min
Landscape_Transurban TCR_1920x951_4-min
Landscape_Transurban TCR_1920x951_5-min
Landscape_Transurban TCR_1920x951-min
Client
Transurban Queensland
Architect
Cox Architecture
Project Manager
CBRE
Completion
March 2020
Project Manager
CBRE
Contract Sum
$7.4m

Transurban Queensland Airport Link Operations Centre (ALOC) Traffic Control Room (TCR) strategy was realigned with the view to consolidating the TCR function within a single “world class” facility.

Phase 1 of the strategy included a 2 floor fitout within the existing Kedron facility requiring the existing TCR remain operational while the new works constructed adjacent. The new space inclusive of a second TCR, structural modifications to improve the open plan workspace layout, comms / data room expansion and infrastructure in preparation for phase 1 and refurbished deck was carefully planned and communicated ensuring no interruptions to the 24 hour operations of this facility.  

Key features and challenges of the project included:  

  • Demolition including removal of walls and area of an active comms rooms including protection and continuation of service.  
  • Electrical methodologies and specialist inductions developed and agreed to by all before any major shutdowns.  
  • Detailed auditing and dilapidation of all existing live services and protection throughout the duration of the construction works.  
  • In excess of 30km of data & electrical cabling and 3km of timber battening were installed throughout the project.  
  • Finishes including carpet, equipment, and Loose Furniture from all over the world delivered on time successfully through the Covid-19 pandemic.  
  • New solar PV installation across the roof area.  
  • Electronic vehicle charging station installed within the car park.
Carousel L_Transurban TCR_1920x1398_2-min
Carousel L_Transurban TCR_1920x1398_3-min
Carousel L_Transurban TCR_1920x1398_4-min
Carousel L_Transurban TCR_1920x1398_5-min
Carousel L_Transurban TCR_1920x1398-min

Services & Sectors

The key services delivered and sector expertise developed on this project.

Fit-out

View Projects

Joinery

View Projects

Workplace

View Projects
Landscape_Transurban TCR_1920x951_2-min
We’re with you.

Considering partnering with us?

Send us a message below and one of our team members will be in touch.

buildcorp-project-4