Meriden Design and Creative Arts Building

28 Redmyre Rd
Strathfield NSW 2135

m3469_3658_©Trevor Mein 2026_large
m3469_3728_©Trevor Mein 2026_large
m3469_3767_©Trevor Mein 2026_large
m3469_4012_©Trevor Mein 2026_large
m3469_4172_©Trevor Mein 2026_large
Client
Meriden School
Architect
Architectus
Project Manager
CTPG
Program
74 weeks
Contract Sum
$32m
Status
Completed

Following the successful delivery of the Meriden Centre for Music and Drama, Buildcorp continued its partnership with Meriden School to deliver the next stage of its campus masterplan: the new Design and Creative Arts Building.

The completed facility comprises three storeys above two basement levels, connected to the existing Wallis Building by a new structural steel link bridge. Purpose-built spaces include art studios and specialist workshops supporting Visual Arts, Design and Technology, Engineering and Hospitality. Generous natural light and strong connections between the indoor learning spaces and surrounding landscape create an inspiring environment in which students can develop their creative abilities.

Buildcorp’s involvement commenced with an intensive four-month Early Contractor Involvement phase. Working closely with Meriden School, the consultant team and specialist subcontractors, Buildcorp developed construction and value engineering solutions that improved buildability, reduced waste and maintained the project’s architectural intent. More than 50 initiatives identified approximately $2.5 million in potential savings, including the redesign of the façade fins from Glass Reinforced Concrete to a lightweight aluminium system.

Delivery required careful planning within an extremely constrained and fully operational school campus. A segregated construction entrance, temporary public footpath, dedicated materials-handling zone and internal delivery slip lane enabled works to proceed safely while minimising interaction with students, staff and the surrounding community. High-impact activities and service connections were programmed around school holidays, with deliveries carefully managed outside peak arrival and departure times.

One of the project’s most complex challenges was the proximity of a major Sydney Water sewer asset to the basement shoring wall. Buildcorp developed a custom protection and excavation methodology that enabled the asset to be safely encased before bulk excavation commenced. Detailed surveying and engineering coordination were also required to integrate the new link bridge with the existing school building while maintaining the required gradients, landings and accessibility provisions.

The building’s architectural identity is defined by its high-performance curtain wall façade and custom vertical aluminium fins, which provide solar shading while creating a distinctive external expression. The project also incorporates a rooftop solar photovoltaic system, rainwater harvesting, natural ventilation, operable windows, low-VOC materials and electric vehicle charging facilities. It achieved a 4 Star Self-Certified Green Star rating.

Completed across more than 160,000 work hours with zero Lost Time Injuries, the project delivers a high-quality and sustainable new learning environment while demonstrating the value of early collaboration, innovative engineering and considered construction within a live education setting.

m3469_3781_©Trevor Mein 2026_large
m3469_4041_©Trevor Mein 2026_large
m3469_4573_©Trevor Mein 2026_large
m3469_4605_©Trevor Mein 2026_large

Services & Sectors

The key services delivered and sector expertise developed on this project.

New Build

View Projects

Joinery

View Projects

Education

View Projects
SAFE   SUSTAINABLE   TRUSTED   IMPACTFUL   PARTNER. 

Considering partnering with us?

Send us a message below and one of our team members will be in touch.

buildcorp-project-4